Installing Cabinerty Hardware-ORC Week 4

Cabinetry Hardware from Amerock

Two short weeks to go until the One Room Challenge deadline arrives! The good news is that we have really made some progress since last week. The bad news is that there’s still so much to do.

We have the framework in place for what was the problem area above the fridge. I am happy to say that I love how it’s working out. It still needs some adjustments, but this was a huge step towards getting there.

Progress Kitchen Cabinets

I was going for a custom built-in look around the fridge, with wine racks above it. They’re not complete yet, but I still feel like my vision really materialized now that the framework is in. A big thanks to my contractor (my husband’s cousin) for accomplishing this for us. Especially since I changed the plan up several times on him.

In addition to that, I’ve gotten most of the cabinets painted with the exception of 2 of the upper doors. One is still being built, and one is still having the glass installed. I also need to paint the inside of the built-ins over the fridge. We did manage to install the cabinetry hardware last weekend.

Thank you to Amerock and Wayfair for supplying the hardware for this project*. I had a hard time narrowing down which hardware to go with because Amerock has so many to choose from.

cabinetry hardware

 

I ending up selecting the Allison Mushroom knobs in the wrought iron dark along with the Inspirations 3″ Center Cup Bin pull. My husband found a quick and easy way to install them using his laser level**.

 

Installing Cabinetry Hardware

The Easy Way to Install Cabinetry Hardware:

  1.  Measure from the ceiling down to where you want the knobs placed.
  2.  Next, attach a laser level at that height on the opposing wall.
  3.  The laser level projects a level light across the front of the cabinets. This way you only have to measure one time, rather than for each door. Mark each door with a pencil where you will drill.
  4.  Drill the holes and attach your hardware.

 

cabinet hardware

I am loving the new hardware, especially those bin pulls. I like that they are a twist on the bin pulls that are so popular right now. As you can see from the photo above, I chose to give my painted cabinets a slight distressing around the edges. It shows up more intense in the photos than it actually looks in person.

As far as other kitchen progress, we purchased our Carrera marble subway tile last weekend at Lowes. We needed 3 boxes and that’s exactly how many were in stock that day, luckily!

Subway tile

The countertops and the undermount sink are being installed today, finally! In reviewing my checklist for this week, I realized that I left several things off of it in the beginning, so this is the updated version.

  • Buy a new refrigerator
  • Add a row of cabinetry above the existing cabinets to extend to the ceiling
  • New countertops
  • New undermount sink
  • New backsplash
  • Paint existing cabinets
  • Add glass fronts to some of the cabinet doors
  • Install lighting in new upper cabinets
  • Install lighting under lower cabinets
  • Add new cabinetry hardware
  • Install new pendants over the sink
  • Completely makeover the existing table and chairs
  • Paint the walls
  • custom built-ins over the refrigerator
  • custom slide out pantry
  • crown molding
  • add bun feet under cabinets

I still need to pick which crown molding we will use to top the cabinets. We’ve decided to just continue that molding throughout the kitchen (yay!). I don’t know if that will really be done by the ORC deadline, but I’m hoping to get it up above the cabinet wall at least.

Our biggest project this weekend will be tiling the backsplash. I have some more painting to do, including 2 more kitchen chairs and a few cabinets to touch up. It will be a busy one over here for sure!

 

In case you missed the previous One Room Challenge posts, you can catch up here:

Week 1- Kitchen Makeover Before

Week 2- Kitchen Design Plans

Week 3- Kitchen Pendant Lighting

Week 4- Installing Cabinetry Hardware

Week 5- DIY Farmhouse Table

Week 6- Kitchen Makeover Reveal

 

*this post was sponsored by Amerock and Wayfair. 

**affiliate link-read my full disclosure policy here.

9 Comments

  1. Oh Roxanne…I love it! That built in fridge frame is genius! That is my one complaint about my kitchen makeover that the fridge sticks out like a sore thumb. Hmm…I wonder if it’s too late to go about this? lol Anyhow the hardware=perfection, and the carrara marble subway=dreamy! Can’t wait to see it all finished!

  2. Wow girl!! You’ve done so much already! You may be the first one to finish a kitchen reno in six weeks! lol. Love your wine rack idea. Can’t wait to see it all come together!

  3. OK, first of all, I LOVE the hardware (and everything else about your kitchen)! I never thought to do hardware this way, but it makes total sense. One more reason to love my laser level!

    1. Thanks Meredith! Using the laser level was my husband’s brilliant idea!

  4. Love the hardware against the distressed white cabinets! It’s all coming along nicely.

  5. You guys are really making progress Roxanne! Love the tile you picked out and the cabinet hardware. Your kitchen is going to look amazing!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.